Aljurf Joud Villas

  Sahel Al Emarat, Abu Dhabi

AED 3.74 M

3, 5 & 7 Bedroom

422 to 965 SQM

5 Years

Q3 - 2024

Villas

Aljurf Joud Villas

Aljurf Joud Villas one of the creations of IMKAN, the renowned name in the Middle East presents you a wide range of villas in its centric community location in AlJurf, inspired from the rich tradition of Arabic homes in the region with courtyards, majlis and maqa’ads to provide rich and layered space for your family. These Villas offers a contemporary design with various Floor Plan sizes with 3, 5 & 7 bedroom units provided giving a wide range of opportunity to choose from.

The Residents can access the wide range of opportunity with access to multiple benefits of restaurants and cafes with canal and water views including Qasr Al Jurf, Jiwar Alqasr, wellness clinic and resort, Tidal canal and Jiwar Alqsr public beach.

The Whole area is covered with beautiful date palms, muster flowers, peach trees and tamarisk bushes; whereas the slow-paced oasis life captures the contrast between lush and dry desert daydreams. The Villas are being inspired by the topography and landscape with natural oasis embraced with shaded pools, golden sand and layers of vegetations providing a heavenly respite from the harsh heat.

Floor Plan

The Development provides well spacious floor plan design which comprises of 3, 5 & 7 bedroom villas ranging from 422 sqm to 965 sqm with balcony and terrace. Each unit is designed with ultra modern interior with its courtyard, majlis and maqaads. Exterior facades are designed with porcelain tiles, which in terms provided a lush beauty to the villas design and the exterior walkways are designed with precast concrete pavers.


Payment Plan

Joud Villas by IMKAN Properties provide a very easy and attractive 30/70 payment plan for homebuyers looking to invest in the AlJurf community region. In terms, the payment plan of villas provides a down payment option of 10% at the time of buying the property and 20% during construction and the remaining 70% payable on handover. The other attractive option also provided by the developer with a 4 to 5 years, post-handover plan.

Option 1: Till Completion / 30-70 Payment Plan

Installment Payment Milestone
Down Payment 10.0% Upon Signing SPA
1st Installment 4.9% Within 7 months from signing SPA (Enabling works completion)
2nd Installment 5.1% Within 13 months from signing SPA (Foundation completion)
3rd Installment 3.2% Within 19 months from signing SPA (Superstructure completion)
4th Installment 5.0% Within 25 months from signing SPA (Completion of Villa envelope)
Final Installment 71.8% 100% Construction Completion

Option 2: Till Completion / 40-60 Payment Plan

Installment Payment Milestone
Down Payment 10.0% Upon Signing SPA
1st Installment 7.5% Within 7 months from signing SPA (Enabling works completion)
2nd Installment 7.5% Within 13 months from signing SPA (Foundation completion)
3rd Installment 7.5% Within 19 months from signing SPA (Superstructure completion)
4th Installment 7.5% Within 25 months from signing SPA (Completion of Villa envelope)
Final Installment 60.0% 100% Construction Completion

Option 3: 4 Year Payment Plan

Installment Payment Milestone
Down Payment 10% Upon Signing SPA
1st Installment 4.9% Within 7 months from signing SPA (Enabling works completion)
2nd Installment 5.1% Within 13 months from signing SPA (Foundation completion)
3rd Installment 5.0% Within 19 months from signing SPA (Superstructure completion)
4th Installment 5.0% Within 25 months from signing SPA (Completion of Villa envelope)
5th Installment 10.0% 100% Construction Completion
6th Installment 15.0% Post Construction Completion Payment 1
7th Installment 15.0% Post Construction Completion Payment 2
8th Installment 15.0% Post Construction Completion Payment 3
9th Installment 15.0% Post Construction Completion Payment 4

Option 4: 5 Year Payment Plan

Installment Payment Milestone
Down Payment 10% Upon Signing SPA
1st Installment 4.9% Within 7 months from signing SPA (Enabling works completion)
2nd Installment 5.1% Within 13 months from signing SPA (Foundation completion)
3rd Installment 5.0% Within 19 months from signing SPA (Superstructure completion)
4th Installment 5.0% Within 25 months from signing SPA (Completion of Villa envelope)
5th Installment 10.0% 100% Construction Completion
6th Installment 10.0% Post Construction Completion Payment 1
7th Installment 10.0% Post Construction Completion Payment 2
8th Installment 10.0% Post Construction Completion Payment 3
9th Installment 10.0% Post Construction Completion Payment 4
10th Installment 10.0% Post Construction Completion Payment 5
11th Installment 10.0% Post Construction Completion Payment 6